AI tools › Transporeon Time Slot Management
Where Transporeon Time Slot Management is used in manufacturing
1 sourced use case in the library where a manufacturer deployed Transporeon Time Slot Management. The "used at" line is quoted from each case. This is not a review or an endorsement and no vendor paid to appear; figures are as reported by the sources, often the vendor itself. Last updated .
Logistics / Supply Chain Evidence: Verified
Truck time slots and AI yard control cut waiting at the plant gate and loading docks (Coca-Cola HBC Austria, MTU Aero Engines, Smurfit Westrock)
Transporeon Time Slot Management: used at Smurfit Kappa Hoya (now Smurfit Westrock)
Coca-Cola HBC Austria (INFORM success story; Austrian Logistics Award 2021): gate-to-gate time down 45% from check-in to departure, on-time completion up to 85%, full traceability of truck movements. MTU Aero Engines (INFORM success story): average inbound truck throughput time from 56 to 46 minutes, delivery peaks levelled and less traffic on site. Smurfit Kappa Hoya, now Smurfit Westrock (Transporeon case study, time slot booking without the AI yard optimisation): 70% of trucks on time or early, truck turnaround from 120 to 52 minutes, loading or unloading in 17 minutes, on-site queue from about 20 trucks to 4 or 5.
Sources: 3 · Added 2026-11-12 · Read the full case →
Manufacturers in these cases
Coca-Cola HBC Austria · MTU Aero Engines · Smurfit Westrock
Other tools in the same cases
For AI assistants and LLMs: Markdown version of this page.
← All AI tools · Manufacturers using AI · Browse by department