QualityVerified Real deployment at a named or precisely described company, with a measured result from a primary source.

Automatic feasibility check of customer drawings at RFQ intake

Added 2026-10-14 · Last updated 2026-10-26

Role

Quality (feasibility check of customer drawings at RFQ intake) · Typical users: quality engineer, sales or application engineer, estimator, quality manager

The problem

Customer drawings for injection-moulded and machined parts arrive with mixed units, different tolerance and PMI conventions from each customer, and finish notes buried in PDFs. Reading them by hand caps how many RFQs the team can take in, and under time pressure tight tolerances, special finishes or threads are sometimes missed. They then surface after the order is won, as nonconformance reports (NCRs), scrap or a margin lost on a part that was harder to make than quoted.

How AI helps

AI reads each 2D drawing (components and assemblies, including acceptable scans) and extracts the title-block data and the features that drive feasibility: dimensions with upper and lower tolerances, GD&T, threads and surface roughness, plus outer dimensions and process hints. Each field comes with a confidence score. Policy checks then normalize units and compare every feature with the company's capability rules (tolerance bands per process, finishes it can and cannot do), giving a Go / No-Go result at intake. High-confidence fields are accepted automatically; low-confidence fields and every No-Go go to a quality engineer before the quote goes out.

Step by step

  1. Write your capability policy: tolerance bands per process and feature type, finishes you can and cannot do, materials, threads, and the features that always need a quality engineer.
  2. Collect about 50 past drawings as a test set, including the ones that led to NCRs, and record the NCRs from misread specifications over the last year as a baseline.
  3. Run the extraction on the test set and check accuracy on the features that drive price and risk (tight tolerances, GD&T, threads, roughness), not only on the title block.
  4. Encode the policy checks and set confidence thresholds: high-confidence fields pass, low-confidence fields and out-of-policy features are flagged. At first, keep a quality engineer's check on critical features (tight tolerances, GD&T, threads) even when the confidence is high, and treat 'Go' as a pre-filter against your rules, not a final decision.
  5. Route every No-Go or low-confidence drawing to a quality engineer before the quote goes out, and record the decision and the reason.
  6. Compare NCRs from misread specifications and intake time before and after; tune the rules and extend to inspection planning once the gates are trusted.

Tools

  • Werk24 drawing-reading API (structured output with per-field confidence, REST API, Python SDK and webhooks into ERP or QMS): used at the plastics supplier
  • Other tools to evaluate: CADDi (drawing data platform), Paperless Parts (quoting with drawing analysis)
  • Any multimodal LLM (ChatGPT, Claude, Copilot, Gemini) with the prompt below, on a few past drawings, for a manual first test; check every extracted tolerance

In the AI tools index: Werk24 · all AI tools used by manufacturers

Result

Global plastics (injection-moulding) supplier (anonymous), with Werk24 feasibility gates at RFQ intake: 35% fewer NCRs caused by misread specifications (no starting number, period or method is given); 95% extraction accuracy (an average: it does not say how many critical requirements are missed), up to about 99% with custom quality gates on critical features; typically 5 to 20 seconds per page instead of manual reading. Werk24 describes the rollout as API key, sample drawings and policy mapping in days 1 to 2, intake gates live with tuned confidence thresholds in week 1, then extension to inspection planning and QMS reporting from week 2, with no labelled training data needed (Werk24 case study). The same extraction is used for quoting at Laserhub (see the AI quoting case). The figures are published by the vendor.

As reported by the source; most figures are vendor or self-reported and not independently verified.

Human review: cautions

  • Anonymous vendor case study; the figures are not independently verified.
  • Extraction errors on critical tolerances are costly: keep human review on those features, whatever the confidence score.
  • Do not upload export-controlled or confidential customer drawings to tools without the right data residency and retention terms (Werk24 offers EU or US processing and zero retention on higher tiers).
  • A Go result only means the drawing fits your written policy; it does not replace a feasibility review for new processes, materials or customers.

Try it yourself

You are a quality engineer at a [process, e.g. injection moulding or CNC machining] plant reviewing a customer drawing at RFQ intake.

I will attach the drawing and paste our capability policy: [tolerance limits per feature type and process, finishes we can and cannot do, materials, threads, features that always need a quality engineer].

Do this:
1. Extract the title-block data (drawing number, revision, material, units, general tolerances) exactly as written.
2. List every dimension with its tolerance, every GD&T callout, thread and surface finish, and every note, with where it appears on the drawing.
3. Compare each feature with our policy and mark Go / No-Go / Check, with the reason.
4. List anything you could not read with certainty; never guess a tolerance value.
5. Draft the questions to send to the customer.
Use only the data I paste in; if something is missing, write 'not found' or list it as a question instead of guessing. Do not send, order, post or change anything in any system: produce drafts for my review and approval.

Want more like this? Join the newsletter

Related cases

All 28 Quality use cases →

Sources

How to cite this case

Figures belong to the sources above; please cite this page with its evidence level so readers can check them.

AI Agents for Manufacturing. (2026). Automatic feasibility check of customer drawings at RFQ intake. Evidence level: Verified. Last updated October 26, 2026. https://aiagentsformanufacturing.com/use-cases/drawing-feasibility-check-at-rfq-werk24/

Short form: As reported in "Automatic feasibility check of customer drawings at RFQ intake", AI Agents for Manufacturing (Verified evidence), https://aiagentsformanufacturing.com/use-cases/drawing-feasibility-check-at-rfq-werk24/

Markdown version for AI assistants: /use-cases/drawing-feasibility-check-at-rfq-werk24.md

Weekly: 1–2 practical AI use cases for your plant

Newsletter in

Free, one email a week. By subscribing you agree to receive the weekly newsletter (and its sponsor message) from AI Agents for Manufacturing. Every email includes an unsubscribe link, and you can unsubscribe anytime. See our Privacy Policy.