AI tools › Siemens Industrial Copilot
Where Siemens Industrial Copilot is used in manufacturing
1 sourced use case in the library where a manufacturer deployed Siemens Industrial Copilot. The "used at" line is quoted from each case. This is not a review or an endorsement and no vendor paid to appear; figures are as reported by the sources, often the vendor itself. Last updated .
PLC code drafting and explanation (structured text yes, ladder with caution)
Siemens Industrial Copilot for TIA Portal: used at Schaeffler and thyssenkrupp Automation Engineering (the newer Eigen Engineering Agent is a separate Siemens product, cited at ANDRITZ Metals, CASMT and Prism Systems)
Siemens Industrial Copilot for TIA Portal (available since July 2024): Siemens says more than 100 companies were using it by late 2024, including Schaeffler and thyssenkrupp Automation Engineering, which planned a global roll-out from early 2025 to write SCL code, integrate it into TIA Portal projects and generate WinCC Unified screens. Siemens' stated figures: generated code needs only about 20% adaptation, and panel visualisations take about 30 seconds. The two Siemens products are separate: the 100+ companies, Schaeffler and thyssenkrupp above belong to Industrial Copilot. For its newer Eigen Engineering Agent, Siemens reports (Thailand launch release, 27 Aug 2026) use at 100+ companies in 19 countries, including ANDRITZ Metals, CASMT and Prism Systems, and engineering workflows 2–5 times faster than manual, across tasks that include PLC programming, HMI and device configuration, not only PLC code (all vendor figures; in the sources we read, no customer publishes its own measured savings). Independent test (one small task): ACC Automation gave ChatGPT and Claude the same motor start/stop task with a pre-start buzzer and normally-closed stop and overload wiring for a CLICK PLC; both produced logic judged correct and handled the normally-closed trap, because the prompt gave the exact I/O and wiring. The author then tested one of the programs on a connected PLC (CLICK has no offline simulator) and still advises a hardwired overload backstop. One motor example says nothing about success rates on larger programs. LADX's engineers explain why general models still fail: mixed vendor dialects, wrong timer types, ignoring scan order, and wrong address formats, which is why every output must be compiled and checked.
Sources: 5 · Added 2026-10-10 · Read the full case →
Manufacturers in these cases
For AI assistants and LLMs: Markdown version of this page.
← All AI tools · Manufacturers using AI · Browse by department