Companies › Yanfeng
How Yanfeng uses AI in manufacturing
1 sourced use case in the library where Yanfeng is named. Each one links to the full case: the problem, how the AI works, the tools, the step-by-step method, a prompt to try and the sources. Figures are as reported by the sources, often the vendor or the company itself. Last updated .
Maintenance Evidence: Verified
Clean up duplicate and incomplete spare-parts records in the material master (ElringKlinger, REHAU, Yanfeng)
Maintenance & reliability
ElringKlinger (about 9,500 employees, automotive supplier): in three years with SPARETECH, its maintenance team adjusted over 9,000 records and cleaned up over 2,200 duplicates, and completeness of relevant material master fields went from 72% to 98% (vendor case study, SPARETECH). SPARETECH also headlines '277% faster material creation'; the page does not give the old and new time per material or say how the percentage is calculated, so it cannot be converted into minutes or checked. The page says ElringKlinger avoided unnecessary procurement costs and optimized inventory but gives no figure for either, and it does not separate what the software's matching did from the maintenance team's own work. This case is about cleaning and standardizing the material master; for finding excess and interchangeable stock across plants, see the MRO Verusen case. REHAU, eight plants in Germany, Poland and Lithuania, SPARETECH connected to SAP through its API: over 50% less time spent searching for and creating materials (quoted by REHAU's data management lead), 14,000 cleansing suggestions, 1,800 duplicate entries identified and 1,500 discontinued items flagged (vendor case study, undated; no baseline time per material is given). Yanfeng, 13 EMEA plants (Germany, Czech Republic, Italy, Spain, Slovakia, Hungary, Serbia, South Africa) merged into one common spare-parts material master, with IBM Maximo and SPARETECH: over 24,000 records enriched with original manufacturer data in early 2023 and over 7,700 duplicate material numbers removed in 3.5 months, about a year and a half after the project started in early 2022 (vendor case study; no inventory or cost figure is given).
Sources: 3 · Added 2026-10-14 · Read the full case →
AI tools in these cases
Other manufacturers in the same cases
For AI assistants and LLMs: Markdown version of this page.