# How ZF uses AI in manufacturing

> 1 sourced AI use case in the AI Agents for Manufacturing library where ZF is named, with the reported result, evidence level, AI tools and sources.

- Canonical URL: https://aiagentsformanufacturing.com/companies/zf/
- Use cases: 1
- Last updated: 2026-11-13
- Publisher: AI Agents for Manufacturing (https://aiagentsformanufacturing.com)
- Evidence levels explained: https://aiagentsformanufacturing.com/evidence/
- All manufacturers: https://aiagentsformanufacturing.com/companies.md
- All cases: https://aiagentsformanufacturing.com/llms.txt

Figures are as reported by each case's sources (often the vendor or the company itself) and are not independently verified; each case page says who reports them.

## [AI predicts which boards really need the slow test, so X-ray and end-of-line test stations stop being the bottleneck (Siemens Amberg, ZF, Flex)](https://aiagentsformanufacturing.com/use-cases/ai-predictive-test-selection-skip-xray-end-of-line-tests-siemens-zf-flex/)

- Markdown: https://aiagentsformanufacturing.com/use-cases/ai-predictive-test-selection-skip-xray-end-of-line-tests-siemens-zf-flex.md
- Evidence level: Verified
- Department: Quality
- Role: Quality and test engineering (end-of-line, X-ray and functional testing)
- AI tools deployed: KNIME Analytics Platform (https://aiagentsformanufacturing.com/tools/knime-analytics-platform.md)
- Other manufacturers in this case: Flex (https://aiagentsformanufacturing.com/companies/flex.md), Siemens (https://aiagentsformanufacturing.com/companies/siemens.md)
- Added: 2026-11-13

Siemens Electronics Works Amberg (Siemens publications): X-ray tests reduced by up to 30% with a quality rate of 100%, and a EUR 500,000 investment in a further X-ray machine avoided. ZF (KNIME success story, the software vendor): physical end-of-line testing reduced by 95%, seven-digit savings on stress-test equipment investments and expected seven-digit yearly energy savings. Flex (company article): at the Guadalajara site, overall test time down 30% and down 50% when a unit fails, built in two months; at a second North American site, 10 to 25 hour test times cut by 20 to 25% and 35% more electronics produced and tested per day. Caution from research: a 2026 peer-reviewed study on 28,000 circuit board runs (Frontiers in Mechanical Engineering) found reduced test plans that saved 18.78% and 91.57% of test time with no escaped defects on past data, but a fixed reduced plan let 110 and 8 defects escape when the process drifted later, while an adaptive policy that returned to the full plan when the process became unstable brought escapes back to zero.

Sources:
- https://assets.new.siemens.com/siemens/assets/api/uuid:0307e035-27bf-4746-82c9-8454f5ab7d86/digilabvienna-artificialintelligence.pdf
- https://www.visionsmag.cz/jak-vyresit-potize-se-zabezpecenim-kvality-s-pomoci-umele-inteligence
- https://www.knime.com/success-story/how-zf-group-improved-end-line-testing-using-knime
- https://flex.com/resources/optimizing-electronics-manufacturing-with-artificial-intelligence-and-machine-learning
- https://www.frontiersin.org/journals/mechanical-engineering/articles/10.3389/fmech.2026.1861443/full

---
Please cite the canonical URL: https://aiagentsformanufacturing.com/companies/zf/