# How Zahoransky uses AI in manufacturing

> 1 sourced AI use case in the AI Agents for Manufacturing library where Zahoransky is named, with the reported result, evidence level, AI tools and sources.

- Canonical URL: https://aiagentsformanufacturing.com/companies/zahoransky/
- Use cases: 1
- Last updated: 2026-10-26
- Publisher: AI Agents for Manufacturing (https://aiagentsformanufacturing.com)
- Evidence levels explained: https://aiagentsformanufacturing.com/evidence/
- All manufacturers: https://aiagentsformanufacturing.com/companies.md
- All cases: https://aiagentsformanufacturing.com/llms.txt

Figures are as reported by each case's sources (often the vendor or the company itself) and are not independently verified; each case page says who reports them.

## [AI reads each molding cycle and tells the setter which machine setting to adjust, so scrap and start-up losses fall (Beko, Zahoransky)](https://aiagentsformanufacturing.com/use-cases/ai-injection-molding-setpoint-recommendations-beko-zahoransky/)

- Markdown: https://aiagentsformanufacturing.com/use-cases/ai-injection-molding-setpoint-recommendations-beko-zahoransky.md
- Evidence level: Verified
- Department: Production
- Role: Production (injection molding: process setting and shift operation)
- AI tools deployed: plus10 (https://aiagentsformanufacturing.com/tools/plus10.md)
- Other manufacturers in this case: Beko (https://aiagentsformanufacturing.com/companies/beko.md)
- Added: 2026-10-21, updated 2026-10-26

Beko Corporate (home appliances) and its suppliers, peer-reviewed study with Koç University: cavity pressure sensors and a neural network that suggests increases or decreases for six machine parameters, used in mass production for 6 months on two parts. On a dishwasher bottom cover molded from 100% recycled 30% glass-filled polypropylene on a 600-ton machine: cycle time down 18%, scrap rate down 800 PPM, and 500 minutes of assembly-line downtime caused by this part eliminated. On a refrigerator inner panel (HIPS, 1,000-ton machine): visual defects eliminated after 6 months, scrap down 52% and start-up scrap down 49%. Model accuracy was 97% and 93% on the two parts (a classification accuracy, not proof that each recommended change gives a good part) (International Journal of Advanced Manufacturing Technology, 2025, open access). Zahoransky (machine builder, Freiburg) with plus10's Hopper on the ramp-up of a 16-cavity line for staked-needle syringes in COC/COP: according to customer feedback, ramp-up time 20% shorter than on similar earlier projects and scrap in the early production phase down 10 to 17%, at an annual output in the millions (Kunststoffe International, 2025, article co-written by plus10 and Zahoransky).

Sources:
- https://link.springer.com/article/10.1007/s00170-025-15611-x