# How Flex uses AI in manufacturing

> 2 sourced AI use cases in the AI Agents for Manufacturing library where Flex is named, with the reported result, evidence level, AI tools and sources.

- Canonical URL: https://aiagentsformanufacturing.com/companies/flex/
- Use cases: 2
- Last updated: 2026-11-13
- Publisher: AI Agents for Manufacturing (https://aiagentsformanufacturing.com)
- Evidence levels explained: https://aiagentsformanufacturing.com/evidence/
- All manufacturers: https://aiagentsformanufacturing.com/companies.md
- All cases: https://aiagentsformanufacturing.com/llms.txt

Figures are as reported by each case's sources (often the vendor or the company itself) and are not independently verified; each case page says who reports them.

## [AI supplier contract review and renewal tracking](https://aiagentsformanufacturing.com/use-cases/ai-supplier-contract-review-renewal-tracking/)

- Markdown: https://aiagentsformanufacturing.com/use-cases/ai-supplier-contract-review-renewal-tracking.md
- Evidence level: Verified
- Department: Procurement
- Role: Purchasing
- AI tools deployed: DocJuris (https://aiagentsformanufacturing.com/tools/docjuris.md), Luminance (https://aiagentsformanufacturing.com/tools/luminance.md)
- Added: 2026-10-15, updated 2026-10-26

Flex (one of the world's largest electronics manufacturers, 140,000+ employees): its Global Procurement and Supply Chain Legal team embedded DocJuris AI screening and playbook-aligned reviews in its workflow; DocJuris says each agreement took an average of eight days to review and redline, mentions back-and-forth email chains and Word redlines, and reports five minutes after (DocJuris case study, undated, a vendor claim; the page does not say how the days and minutes are measured or how much of the eight days was working time, so do not read it as a labour saving). Trench Group (the Luminance page does not describe the company): Luminance does the first-pass review and suggests standard alternatives; average contract review time fell from 150 minutes to approximately 30 minutes, Sales and Operations are empowered to handle 80% of contracts, and a tariff review project took less than 2 hours versus 2.5 weeks without Luminance (Luminance customer story, undated, a vendor claim; the page gives no measurement method and does not say that Legal is out of the loop).

Sources:
- https://www.docjuris.com/case-studies/how-flex-reduced-contract-review-from-8-days-to-5-minutes
- https://www.luminance.com/customers/how-luminances-legal-grade-ai-is-transforming-trench-groups-contract-activity/

## [AI predicts which boards really need the slow test, so X-ray and end-of-line test stations stop being the bottleneck (Siemens Amberg, ZF, Flex)](https://aiagentsformanufacturing.com/use-cases/ai-predictive-test-selection-skip-xray-end-of-line-tests-siemens-zf-flex/)

- Markdown: https://aiagentsformanufacturing.com/use-cases/ai-predictive-test-selection-skip-xray-end-of-line-tests-siemens-zf-flex.md
- Evidence level: Verified
- Department: Quality
- Role: Quality and test engineering (end-of-line, X-ray and functional testing)
- AI tools deployed: KNIME Analytics Platform (https://aiagentsformanufacturing.com/tools/knime-analytics-platform.md)
- Other manufacturers in this case: ZF (https://aiagentsformanufacturing.com/companies/zf.md), Siemens (https://aiagentsformanufacturing.com/companies/siemens.md)
- Added: 2026-11-13

Siemens Electronics Works Amberg (Siemens publications): X-ray tests reduced by up to 30% with a quality rate of 100%, and a EUR 500,000 investment in a further X-ray machine avoided. ZF (KNIME success story, the software vendor): physical end-of-line testing reduced by 95%, seven-digit savings on stress-test equipment investments and expected seven-digit yearly energy savings. Flex (company article): at the Guadalajara site, overall test time down 30% and down 50% when a unit fails, built in two months; at a second North American site, 10 to 25 hour test times cut by 20 to 25% and 35% more electronics produced and tested per day. Caution from research: a 2026 peer-reviewed study on 28,000 circuit board runs (Frontiers in Mechanical Engineering) found reduced test plans that saved 18.78% and 91.57% of test time with no escaped defects on past data, but a fixed reduced plan let 110 and 8 defects escape when the process drifted later, while an adaptive policy that returned to the full plan when the process became unstable brought escapes back to zero.

Sources:
- https://assets.new.siemens.com/siemens/assets/api/uuid:0307e035-27bf-4746-82c9-8454f5ab7d86/digilabvienna-artificialintelligence.pdf
- https://www.visionsmag.cz/jak-vyresit-potize-se-zabezpecenim-kvality-s-pomoci-umele-inteligence
- https://www.knime.com/success-story/how-zf-group-improved-end-line-testing-using-knime
- https://flex.com/resources/optimizing-electronics-manufacturing-with-artificial-intelligence-and-machine-learning
- https://www.frontiersin.org/journals/mechanical-engineering/articles/10.3389/fmech.2026.1861443/full

---
Please cite the canonical URL: https://aiagentsformanufacturing.com/companies/flex/
